Hot-mixed lime mortar
Hot-mixed Lime Mortar, published by Historic Environment Scotland in April 2015 states: ‘Hot-mixed lime mortars are prepared by adding specific measures of quicklime to aggregate and water and mixing together to form a mortar. The quicklime reacts with water generating heat, and simultaneously binds together with the sand or aggregate to produce a mortar. This mortar is ‘hot’, from the reaction, and (can) be used while still warm (for certain works) or stored (‘banked’) for later use. This differs from other methods of preparing lime mortars where slaked lime (lime that has already reacted with water to form a putty or a dry hydrate powder) is added to aggregate to form a mortar. Hot-mixed lime mortars have some different properties to mortars prepared from mature lime putty or bagged dry hydrate powdered lime due to the effect of the heat of the reaction, and the high alkalinity of the lime, on the aggregates and other components in the mix.’
[edit] Related articles on Designing Buildings
Featured articles and news
Retrofit 25 – What's Stopping Us?
Exhibition Opens at The Building Centre.
Types of work to existing buildings
A simple circular economy wiki breakdown with further links.
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
The smart construction dashboard, as-built data and site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure Bill
An outline of the bill with a mix of reactions on potential impacts from IHBC, CIEEM, CIC, ACE and EIC.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.