Hot-mixed lime mortar
Hot-mixed Lime Mortar, published by Historic Environment Scotland in April 2015 states: ‘Hot-mixed lime mortars are prepared by adding specific measures of quicklime to aggregate and water and mixing together to form a mortar. The quicklime reacts with water generating heat, and simultaneously binds together with the sand or aggregate to produce a mortar. This mortar is ‘hot’, from the reaction, and (can) be used while still warm (for certain works) or stored (‘banked’) for later use. This differs from other methods of preparing lime mortars where slaked lime (lime that has already reacted with water to form a putty or a dry hydrate powder) is added to aggregate to form a mortar. Hot-mixed lime mortars have some different properties to mortars prepared from mature lime putty or bagged dry hydrate powdered lime due to the effect of the heat of the reaction, and the high alkalinity of the lime, on the aggregates and other components in the mix.’
[edit] Related articles on Designing Buildings
Featured articles and news
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from constructuon and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.
The increasing costs of repair and remediation
Highlighted by regulator of social housing, as acceleration plan continues.
Free topic guide on mould in buildings
The new TG 26/2024 published by BSRIA.
Greater control for LAs over private rental selective licensing
A brief explanation of changes with the NRLA response.
Practice costs for architectural technologists
Salary standards and working out what you’re worth.
The Health and Safety Executive at 50
And over 200 years of Operational Safety and Health.
Thermal imaging surveys a brief intro
Thermal Imaging of Buildings; a pocket guide BG 72/2017.